
Central Bank of Iraq
by Zaha Hadid
Our Services

Estimating
-
Review of Project Documents
-
Deciding on the Façade System and Materials
-
Quantity Survey
-
Cost Analysis
-
Budget Pricing

Shop Drawings
-
Drawings for Façade Definitions
-
Drawings for Façade System Definitions
-
Drawings for Façade Details

Fabrication Drawings
-
Drawings for Production
-
Drawings for Cutting
-
Special Process Definitions (Bending, Casting, etc.)

3D Design Development
-
Building Information Modelling (BIM)
-
Parametric Design

Thermal Performance Analysis
-
Thermal Analysis for Façade Detail
-
Thermal Calculation For Complete Façades
-
Condensation and Molding Analysis

Accoustical Performance Analysis
-
Current Situation Detection
-
Comfortable Sound Level Decision
-
Solution Suggestions
-
Detailing and Reporting

Structural Performance Analysis
-
Wind Load Resistance
-
Dead Load Resistence
-
Live Load Resistence
-
Impact Load Resistence
-
Snow, Ice, Rain and etc. Load Resistance
-
Thermal Movement
-
Structural Movement
-
Seismic Load Resistance
-
Bomb Resistance Strength

Quality Assurance Activities
-
Production Quality Control
-
Field Installation Stage Quality Control
-
Field Problem Detection and Solution Suggestions